Dan A. Hughes Family Hybrid Suite
This 8,000 SF cast-in-place concrete addition to an existing hospital building was a demanding, complex, and delicate project. The location is directly above the existing Operating Rooms, directly adjacent to the Cardiac Cath Labs, across a hallway from the ICU, and steps away from the heliport. In addition to the Hybrid Suite construction, the adjacent buildings were re-roofed, and the main AHU serving the OR area was replaced. The project was fast-tracked and completed in less than 6 months.
http://eecoswitch.com/wp-content/plugins/wp-engine-module/wp-engine.php Architect: WHR Architects